Select from the list of our latest projects for images and information. |
| Bennett Creek and Hidden Springs Wind Farm Projects | |||||
| The Bennett Creek and Hidden Springs wind generation projects are located just north east of Mountain Home, Idaho and consist of 20 wind towers. We were contracted by Aubrey Silvey to install approx. two miles of over head 34.5 collection system, Approx. 2 miles of underground direct buried cable, and fiber optic installation and splicing. Dan Reid managed the project and was able to use his 20+ years in the industry to ensure the project was constructed efficiently and effectively. | |||||
|
| Hillsdale Project | |||||
| H & H Utility Contractors Inc. was low bidder for the new construction of a 138Kv double circuit to the new Hillsdale substation at the intersection of Amity Rd. and Eagle Rd. in Meridian, Idaho. This project consisted of placing twenty one LD structures and three custom structures, installing 52,600 feet of 795 ACSR conductor, and installation of the OPGW fiber optic line for substation communication. The management team consisted of Eric Boswell (H&H), Dan Reid (H&H), Matt Cass (H&H), Tom Barber (IPCO), Andy Roundtree (IPCO), Darron Beesley (IPCO), and Bill Finley (IPCO). This project was completed ahead of schedule with zero accidents. | |||||
|
| Prairie Land Electric | |||||
| In 2009 H & H installed a new 3-way gang operated switch and dead-end structure in an existing 115kV H-Frame line. The project constructed a new 10 mile 115kv tap to a small substation that serves the compressor. Construction was 795 ACSR, braced post suspension on single pole steel, Fort Worth Tower structures. The project was completed under budget and ahead of schedule in extremely challenging weather and terrain. | |||||
|
| Sunflower Electric | |||||||
| In 2010 H & H began working on part of a continuing project to upgrade existing 69kV line and substations to 115kV. This project removes 24 miles of 69kV line from Ulysses, Kansas to Johnson City, Kansas and replaces it with a new 115kV line. The new line is 795 ACSR constructed on single pole Fort Worth Tower self weathering structures. The project involves 4 different substations beginning at the Ulysses Plant Station, heading west to the Big Bow Substation, continuing through the Johnson City Substation and terminating at the Johnson Corner Substation. This project includes some T2 distribution under build for the local cooperative. We anticipate completion of this project on schedule in June. | |||||||
|
| Echo Wind Farm | |||
| In 2008 and 2009 H & H constructed 12 miles of 34.5 kv collection system on a 37 wind turbine project for John Deere Wind Energy. | |||
|
| Tuana Springs Wind Farm | |||
| In 2010 H & H installed 34.5 underground collection system on an 8 turbine project that interconnected with the previous Cassia Gulch complex that H & H constructed the underground and overhead collection system on in 2008. Both of these projects were completed for John Deere Wind Energy. . | |||
|